Dates – November 2021 – February 2022
Our comprehensive playground development began with site preparation, including the installation of safety fall zones and secure perimeter fencing. We meticulously managed:
*Excavation work for concrete footpaths
*Professional site preparation with proper compaction
*Strategic drainage implementation
*Precise boxing for footpaths and mowing strips
Distinctive rock features were thoughtfully positioned before preparing the cushion fall area. This included laying high-quality geotechnical cloth as a foundation for the cushion fall material, ensuring optimal safety and longevity. Our team also crafted and installed comfortable picnic facilities, including bench seats and table sets. The playground equipment installation featured a variety of engaging elements:
*Swing sets
*Challenging climbing net
*Whimsical ladybird springer
*Dynamic spinning back feature
*Exciting slide
Throughout the project, we provided expert supervision for the sunshade installation, professionally executed by Shade Systems, completing this vibrant recreational space.