Dates – April 2021 – July 2021
Description
Our comprehensive playground renovation project involved a full-scale transformation, replacing an outdated facility with a modern, engaging play environment.
Demolition & Site Preparation
We began with careful demolition of the existing playground structures, followed by thorough site clearance and precise waste removal. Our team meticulously mapped out the new playground footprint, establishing proper safety fall zones and secure perimeter boundaries.
The foundation phase included:
*Professional excavation for durable concrete footpaths
*Methodical site preparation with proper compaction techniques
*Precise boxing for structural integrity
*Installation of concrete footpaths and clean mowing strips
*Construction of an attractive perimeter picket fence with secure gates
*Implementation of effective drainage solutions
Safety Features
Safety remained paramount throughout the project, with careful preparation of the cushion fall areas. This included the installation of high-quality geotechnical cloth as the foundation layer before applying the protective cushion fall material.
Innovative Play Elements
The playground’s centerpiece features a custom-designed play mound complete with:
An exciting tunnel system
An engaging slide feature
Premium artificial grass surfaces
We installed various dynamic play components including:
*Multi-user swing sets
*Interactive clatter bridge
*Imaginative water and sand play stations
*Charming sprung fire engine
*Naturally inspired log play elements arranged for creative exploration
Throughout the project, we provided expert supervision for the sunshade installation, professionally executed by Shade Systems, ensuring this vibrant playground offers both fun and sun protection.